loading

Leading Hollow Fiber Membrane Spinning Machine and Spinneret Manufacturer - Trustech

Minimizing cross-contamination from line holdup during multi-component dope switching (CIP/SIP time, solvent use, verification)?

2025-12-05
● Three-step “push–clean–verify”:

● Push: displace dope A under laminar flow (Re < 2000) with high-purity solvent until a clear interface forms to maximize physical displacement.

● Clean (CIP): run preset CIP using the same or compatible solvent for the next dope B for forced circulation flushing.

● Verify: inline sampling with UV spectrophotometer or inline viscometer; when key indices (e.g., absorbance) reach baseline and stabilize, cleaning passes.

● Quantification: optimize CIP time, flowrate, and solvent volume based on verification data to achieve minimal consumption with assured effectiveness.

prev
How to prevent “rod climbing” and plugging when feeding high-solids content dope?
How to online calibrate zero drift and temperature compensation for loss-in-weight feeders and Coriolis mass flow meters in high-viscosity fluids?
next
Related questions
no data
GET IN TOUCH WITH Us
Ready to work with us ?

About Trustech

Contact Us
Follow Us
Customer service
detect