loading

Leading Hollow Fiber Membrane Spinning Machine and Spinneret Manufacturer - Trustech

How to install and commission a hollow fiber spinneret

2025-12-03
● Clean and inspect: Ensure no contaminants inside/outside the hollow fiber spinneret; orifices unblocked; sealing tapes (PTFE, etc.) free of debris entering the hollow fiber spinneret.

● Alignment: Precisely align the hollow fiber spinneret with coagulation bath and take-up to ensure vertical fiber fall.

● Connect lines: Correctly connect bore fluid and shell dope (or single dope) feeds; ensure leak-free seals.

● Preheat and degas: Preheat to process temperature before feeding and purge all trapped air.

● Trial run and tuning: Start at low flow; observe filament formation (breakage, eccentricity, bubbles), then gradually adjust bore/shell flow ratio, temperatures, and take-up speed to stable operation.

prev
What factors affect the service life of a hollow fiber membrane spinneret?
Which processes are suitable for hollow fiber spinnerets ?
next
Related questions
no data
GET IN TOUCH WITH Us
Ready to work with us ?

About Trustech

Contact Us
Follow Us
Customer service
detect