● Complete degassing: Purge bubbles before start to prevent breaks or bubble defects.
● Low speed start: Ramp slowly; observe fiber and then increase.
● Synchronous bore/shell start: Avoid dry extrusion or lumen collapse.
● Coagulation bath matching: Maintain composition, temperature, level; precisely control air-gap length.
● Pressure/flow tuning: Begin low and ramp; keep pressure ripple ≤3%; stabilize bore/shell flow ratio (e.g., UF often ~1:1.2).
● Dope pretreatment: Verify filtration (≤5 μm) and viscosity spec (variation ≤5%) to avoid clogging/nonuniform extrusion.
● Flow control: Match supply to outflow to maintain multi-orifice uniformity.
● Real-time monitoring: Watch pressure/flow/temperature; stop and troubleshoot if abnormal.
● Record parameters: Maintain SOPs for reproducibility and optimization.