loading

Leading Hollow Fiber Membrane Spinning Machine and Spinneret Manufacturer - Trustech

Start-up and tuning precautions

2025-12-03
● Thorough preheat: Preheat hollow fiber membrane spinneret, lines, and tanks to set temperatures; soak ≥30 min for uniformity. For TIPS, preheat to the specified temperature (e.g., ≥150°C) to avoid viscosity swings.

● Complete degassing: Purge bubbles before start to prevent breaks or bubble defects.

● Low speed start: Ramp slowly; observe fiber and then increase.

● Synchronous bore/shell start: Avoid dry extrusion or lumen collapse.

● Coagulation bath matching: Maintain composition, temperature, level; precisely control air-gap length.

● Pressure/flow tuning: Begin low and ramp; keep pressure ripple ≤3%; stabilize bore/shell flow ratio (e.g., UF often ~1:1.2).

● Dope pretreatment: Verify filtration (≤5 μm) and viscosity spec (variation ≤5%) to avoid clogging/nonuniform extrusion.

● Flow control: Match supply to outflow to maintain multi-orifice uniformity.

● Real-time monitoring: Watch pressure/flow/temperature; stop and troubleshoot if abnormal.

● Record parameters: Maintain SOPs for reproducibility and optimization.

prev
Working temperature range of hollow fiber spinneret
Common materials for hollow fiber spinnerets
next
Related questions
no data
GET IN TOUCH WITH Us
Ready to work with us ?

About Trustech

Contact Us
Follow Us
Customer service
detect